Ave Maria University
We were contracted by SCG Fields to complete site work for a grass to synthetic turf field conversion at Ave Maria University.
We were contracted by SCG Fields to complete site work for a grass to synthetic turf field conversion at Ave Maria University.
We were contracted by Bishop Moore Catholic School to renovate an existing grass and clay baseball infield. The renovation included converting the natural grass infield to a synthetic turf infield.
We were contracted through Central Florida K-9 to renovate several dog kennel areas.
We were contracted through Fieldturf to construct a synthetic turf multipurpose field.
We were contracted through Tavistock to install a synthetic turf fish at the common area inside Lake Nona Town Center.
We were contracted through Orangewood Christian School to renovate an existing grass baseball field. The renovation included converting the natural grass/clay infield to a synthetic turf infield.
We were contracted with Orlando City Soccer club to convert the existing MLB Baseball field into MLS Soccer Training field. The facility was a complete site redevelopment.
Orlando City Soccer Club – Heritage Park Training Read More »
We were contracted through Childers Construction and the University of West Florida to design/build and install a synthetic turf practice football field.
We were contracted through Brightview to install a synthetic turf common area for the Wyndham Resort Orlando location.
We were contracted through XL Soccer World to design/build a custom shade structure for the courtyard patio area, to maintain the indoor and outdoor synthetic turf fields, and to build a synthetic turf soccer field. Which is used for adult and kid league soccer extensively. We were also contracted to design and build a natural grass soccer field and to complete a complete redevelopment of their back 2 acres for a new natural grass soccer field including warm up area.